Mckenzie & Ridley (Kawerau) Ltd MRK
 
  MRK  
 

RECENT MAJOR CONTRACTS

McKenzie and Ridley (Kawerau) Ltd:
 
 
2013 (to May)
  • Pukepine , TePuke - Reroll Boiler Tubes and Repair
  • Norske Skog, Kawerau - TA3 Exhaust and Ducting
  • CHH Tasman, Kawerau - March Shut
  • CHH Tasman, Kawerau - Repair Cracks in Superheater
  • Cedenco Foods, Gisborne - Repairs to Boiler
  • CHH Kinleith, Tokoroa - May Shut and Installation of Cascade Wheel
 
2012
  • Ballance Agri Nutrients Kapuni, Design/Fabrication, Supply, Installation,
    Commissioning to Commercial Steaming Standards of 30t/hr Waste Heat Flue Gas Boiler
  • CHH Tasman, Shut Work
  • Fonterra Waitoa, Boiler 4 Grate Overhaul
  • PanPac Forest Products, Economiser Repairs
  • Trust Power, Cavatation Preventation/Monitoring/Repair
  • Fonterra Waitoa, Grate Shaft Bearing Replacement
  • CHH Kinleith, May and September Shuts
  • CHH Woodproducts-Whangerei, Tube Expanding
  • Fonterra Waitoa, Machine Shaft and Install Grate Seals
  • CHH Kinleith, Fabricate and Install Causticisng Spools
  • Manildra Starches, Australia, Replace Economiser Elements
  • Transfield Worley, Design/Fabrication, Supply, Installation, Commissioning
    to Commercial Steaming Standards of 7mw Lignite Coal Fired Boiler
 
2011
  • Kinleith - May and September Shuts
  • Kinleith - RB4 Sootblower Isolation Valves
  • Kinleith - Installation of Pipebridge
  • Tasman - Shuts, Handrails on Hot Lime Tanks
  • Kinleith - RB4 Roof and Wall Tubes
  • Westland Milk Products - Retractable Sootblower Installation
  • Fonterra Waitoa - Grate Spares
  • Fonterra Waitoa - Re-build of Grate
  • Fonterra Hautapu - Re-tube Boiler
  • Fonterra Hautapu - No. 2, Grate Repairs
  • Open Country Dairy Co - Supply of Enchem Level 2 Boiler Operators
  • Fonterra Takaka - Repair Re-circulating Duct in Air-Heater
  • Ballance Agri Nutrients Tauranga - Superheater Fabrication and commissioning
 
2010
  • Fonterra Waitoa, Grate Repairs
  • North Island Mussel Processors, S/S Steam Line
  • PanPac Forest Products, Installation of Economiser
  • H.C Extractions (Australia), Installation of Heat Recovery Oil Heater
  • CHH Tasman – Repair Air Heater Elements
  • PR & S Snook & Sons – Refurbish Boiler
  • CHH Kinleith – Repairs to Cascade Wheel
  • Whakatane Hospital – Steam Compliance
  • Pan Pac Forests – Boiler Survey
  • Bega Cheese – Repair leaks and refractory maintenance
  • Manildra Starches, Nowra, Australia - Generating Bank Re-tube
 
2009
  • Manildra Starches, Nowra, Australia - Supply & Installation of new Economiser
  • Westland Dairy Co - Fabrication & installation 20 bar steam line
  • CHH Kinleith - Wall Tube supply & installation (Composite)
  • Bega Cheese (Australia) - Cyclone supply
  • Mussel Processors  - Supply, Install and commission steam plant
  • CHH Whakatane - Boiler efficiency test
  • CHH Tasman - Evaporator tube replacement
 
2008
  • Fonterra Clandeboye – Retube Boilers
  • Alliance Pukeuri – Grit Arrestor Re-build
  • CHH Whakatane – Re-build/Replace Superheater
  • Westland Dairy – New Economiser
  • CHH Wood Products Mt Maunganui – Supply and Install New 4MW Turnkey Boiler
  • Fonterra Waitoa, Grate Work
  • CHH Whakatane, Annual Surveys
  • CHH Tasman, Retube PB3 Airheater, Superheater Re-tube, Replace Baffle Wall
  • Cedenco Foods, Boiler Blowdown Heat Recovery Unit
  • Cedenco Foods, Supply and Install Boiler
 
2007
  • Timtech Chemicals – Install Wood Treatment Plant
  • Pan Pac Forest Products – Economiser Replacement
  • Penfords NZ – Deaerator
  • CHH Tasman & Kinleith – Recovery Boiler Smelt Spout Apertures Manipulated
  • Westland Milk Products – Header Repair, Deaerator Heat Recovery Unit
  • Wallace Corporation – Boiler Retube
  • Dairi Concepts, Allerton, USA – Caseinate Coil Replacement
  • National Meats Taupo – Full Containerised Steam Plant
 
2006
  • CHH Kinleith – Chip Bin Cyclone
  • CHH Tasman - Annual Boiler Maintenance Shut
  • Fonterra Waitoa - Grit Arrestor Cyclones Replacement
  • NGC Taranaki - Economiser
  • Westland Milk Products - Fly Ash System Modifications and Auxiliary Economiser Installation
  • CHH Tasman - Power Boiler No. 2 Grate Re-build
  • Ravensdown Napier - Boiler Re-tube
  • CHH Kinleith - Superheater Bends Replacement
 
2005
  • Westland Milk Products, No. 3 Boiler Baghouse Installation and
    Upgrade to Limited Attendance Operation Including OSH Compliance
  • Major shuts at CHH Tasman and Kinleith on Steam Plant.
  • Permapine - Boiler and Treatment Plant Installation
  • Taranaki By Products - Boiler Re-tube and Rebuild
  • OSH/M&I Compliance Annual Surveys and Quarterly Tests at
    Fonterra Reporoa, Tirau, Stirling, Tatua, Kiwi Lumber Putaruru and Westland Milk Products
  • Army Training Group, Waiouru, Boiler Galloway Tube Repair
 
2004
  • Methanex –Foster Wheeler Boiler Partial Re-tube
  • CHH Tasman - 2 Power Boiler Cold Side Re-Tube
  • Shell Todd Oil Services - FPSO Port Boiler Partial Re-tube
  • Shell Todd Oil Services - FPSO Starboard Boiler Re-tube
  • Alliance Pukeuri -  Foster Wheeler Boiler Re-tube
  • Fonterra Reporoa - Boiler Relocation and Upgrade to
    Unattended Operation Including OSH Compliance
  • CHH Tasman - No. 2 Power Boiler Grate Replacement
  • Major Shuts at CHH Tasman and Kinleith on Steam Plant
  • Fonterra Tirau - Boiler Control Upgrade
  • CHH Tasman - Lime Kiln Ducting Replacement
 
2003
  • Fonterra Stirling, Boiler Upgrade to Unattended Operation including OSH compliance
  • Manildra Starches, Nowra, Australia, Fin Tube Economiser
  • Fonterra Tirau, Repair Back Wall Boiler
  • Fonterra Tirau, Supply and Install Replacement Deaerator
  • Murray Gouldburn, Nowra, Australia, Repair Tomlinson “O” Type Boiler
  • Murray Gouldburn, Tangambalanga, Australia, Installation of Plastic Belt on Cheddarmaster
  • Unilever, Tatura, Australia, Removal and Transporting of Boiler
  • CHH Tasman, Install 150NB Line for No.1 Evaps
  • CHH Tasman, No2 Recovery Boiler Shut
 
MRK    
Operational Capabilities: New Zealand - Australia - South Pacific
     

JAS-ANZ


ISO 9001 Certified

 
© Mckenzie & Ridley (Kawerau) Ltd