RECENT MAJOR CONTRACTS
McKenzie and Ridley (Kawerau) Ltd:
2013 (to May)
- Pukepine , TePuke - Reroll Boiler Tubes and Repair
- Norske Skog, Kawerau - TA3 Exhaust and Ducting
- CHH Tasman, Kawerau - March Shut
- CHH Tasman, Kawerau - Repair Cracks in Superheater
- Cedenco Foods, Gisborne - Repairs to Boiler
- CHH Kinleith, Tokoroa - May Shut and Installation of Cascade Wheel
2012
- Ballance Agri Nutrients Kapuni, Design/Fabrication, Supply, Installation,
Commissioning to Commercial Steaming Standards of 30t/hr Waste Heat Flue Gas Boiler
- CHH Tasman, Shut Work
- Fonterra Waitoa, Boiler 4 Grate Overhaul
- PanPac Forest Products, Economiser Repairs
- Trust Power, Cavatation Preventation/Monitoring/Repair
- Fonterra Waitoa, Grate Shaft Bearing Replacement
- CHH Kinleith, May and September Shuts
- CHH Woodproducts-Whangerei, Tube Expanding
- Fonterra Waitoa, Machine Shaft and Install Grate Seals
- CHH Kinleith, Fabricate and Install Causticisng Spools
- Manildra Starches, Australia, Replace Economiser Elements
- Transfield Worley, Design/Fabrication, Supply, Installation, Commissioning
to Commercial Steaming Standards of 7mw Lignite Coal Fired Boiler
2011
- Kinleith - May and September Shuts
- Kinleith - RB4 Sootblower Isolation Valves
- Kinleith - Installation of Pipebridge
- Tasman - Shuts, Handrails on Hot Lime Tanks
- Kinleith - RB4 Roof and Wall Tubes
- Westland Milk Products - Retractable Sootblower Installation
- Fonterra Waitoa - Grate Spares
- Fonterra Waitoa - Re-build of Grate
- Fonterra Hautapu - Re-tube Boiler
- Fonterra Hautapu - No. 2, Grate Repairs
- Open Country Dairy Co - Supply of Enchem Level 2 Boiler Operators
- Fonterra Takaka - Repair Re-circulating Duct in Air-Heater
- Ballance Agri Nutrients Tauranga - Superheater Fabrication and commissioning
2010
- Fonterra Waitoa, Grate Repairs
- North Island Mussel Processors, S/S Steam Line
- PanPac Forest Products, Installation of Economiser
- H.C Extractions (Australia), Installation of Heat Recovery Oil Heater
- CHH Tasman – Repair Air Heater Elements
- PR & S Snook & Sons – Refurbish Boiler
- CHH Kinleith – Repairs to Cascade Wheel
- Whakatane Hospital – Steam Compliance
- Pan Pac Forests – Boiler Survey
- Bega Cheese – Repair leaks and refractory maintenance
- Manildra Starches, Nowra, Australia - Generating Bank Re-tube
2009
- Manildra Starches, Nowra, Australia - Supply & Installation of new Economiser
- Westland Dairy Co - Fabrication & installation 20 bar steam line
- CHH Kinleith - Wall Tube supply & installation (Composite)
- Bega Cheese (Australia) - Cyclone supply
- Mussel Processors - Supply, Install and commission steam plant
- CHH Whakatane - Boiler efficiency test
- CHH Tasman - Evaporator tube replacement
2008
- Fonterra Clandeboye – Retube Boilers
- Alliance Pukeuri – Grit Arrestor Re-build
- CHH Whakatane – Re-build/Replace Superheater
- Westland Dairy – New Economiser
- CHH Wood Products Mt Maunganui – Supply and Install New 4MW Turnkey Boiler
- Fonterra Waitoa, Grate Work
- CHH Whakatane, Annual Surveys
- CHH Tasman, Retube PB3 Airheater, Superheater Re-tube, Replace Baffle Wall
- Cedenco Foods, Boiler Blowdown Heat Recovery Unit
- Cedenco Foods, Supply and Install Boiler
2007
- Timtech Chemicals – Install Wood Treatment Plant
- Pan Pac Forest Products – Economiser Replacement
- Penfords NZ – Deaerator
- CHH Tasman & Kinleith – Recovery Boiler Smelt Spout Apertures Manipulated
- Westland Milk Products – Header Repair, Deaerator Heat Recovery Unit
- Wallace Corporation – Boiler Retube
- Dairi Concepts, Allerton, USA – Caseinate Coil Replacement
- National Meats Taupo – Full Containerised Steam Plant
2006
- CHH Kinleith – Chip Bin Cyclone
- CHH Tasman - Annual Boiler Maintenance Shut
- Fonterra Waitoa - Grit Arrestor Cyclones Replacement
- NGC Taranaki - Economiser
- Westland Milk Products - Fly Ash System Modifications and Auxiliary Economiser Installation
- CHH Tasman - Power Boiler No. 2 Grate Re-build
- Ravensdown Napier - Boiler Re-tube
- CHH Kinleith - Superheater Bends Replacement
2005
- Westland Milk Products, No. 3 Boiler Baghouse Installation and
Upgrade to Limited Attendance Operation Including OSH Compliance
- Major shuts at CHH Tasman and Kinleith on Steam Plant.
- Permapine - Boiler and Treatment Plant Installation
- Taranaki By Products - Boiler Re-tube and Rebuild
- OSH/M&I Compliance Annual Surveys and Quarterly Tests at
Fonterra Reporoa, Tirau, Stirling, Tatua, Kiwi Lumber Putaruru and
Westland Milk Products
- Army Training Group, Waiouru, Boiler Galloway Tube Repair
2004
- Methanex –Foster Wheeler Boiler Partial Re-tube
- CHH Tasman - 2 Power Boiler Cold Side Re-Tube
- Shell Todd Oil Services - FPSO Port Boiler Partial Re-tube
- Shell Todd Oil Services - FPSO Starboard Boiler Re-tube
- Alliance Pukeuri - Foster Wheeler Boiler Re-tube
- Fonterra Reporoa - Boiler Relocation and Upgrade to
Unattended Operation Including OSH Compliance
- CHH Tasman - No. 2 Power Boiler Grate Replacement
- Major Shuts at CHH Tasman and Kinleith on Steam Plant
- Fonterra Tirau - Boiler Control Upgrade
- CHH Tasman - Lime Kiln Ducting Replacement
2003
- Fonterra Stirling, Boiler Upgrade to Unattended Operation including OSH compliance
- Manildra Starches, Nowra, Australia, Fin Tube Economiser
- Fonterra Tirau, Repair Back Wall Boiler
- Fonterra Tirau, Supply and Install Replacement Deaerator
- Murray Gouldburn, Nowra, Australia, Repair Tomlinson “O” Type Boiler
- Murray Gouldburn, Tangambalanga, Australia, Installation of Plastic Belt on Cheddarmaster
- Unilever, Tatura, Australia, Removal and Transporting of Boiler
- CHH Tasman, Install 150NB Line for No.1 Evaps
- CHH Tasman, No2 Recovery Boiler Shut
|
|
 |
|
|